
Step 1.
The pin is inserted through a prepared hole and the collar is placed
over the pintail.
Step 2.
The nose assembly, attached to HUCK's installation tool, is placed over
the pintail. The nose assembly pulls on the pintail, drawing the
work pieces together.
Step 3.
Continued pulling on the pintail moves the anvil forward swaging the
collar into the locking grooves. The controlled swaging
lengthens the collar to develop clamp.
Step 4.
When the swaging is completed, the pintail separates from the pin, and
the tool ejects the swaged collar out of the anvil, completing
the installation.
|